Skip to main content

Volkswagen and BMW Join Forces On Express Charging Stations

VOLKSWAGEN, BMW AND CHARGEPOINT JOIN FORCES TO CREATE ELECTRIC VEHICLE EXPRESS CHARGING CORRIDORS ON THE EAST AND WEST COASTS


• A goal of nearly 100 DC Fast charging ports will be installed to support long distance and metropolitan electric vehicle travel with the BMW i3, Volkswagen e-Golf and other electric cars, along heavily trafficked corridors on both coasts, supported by Level 2 chargers.

• These publicly available charging stations will be added to the existing ChargePoint network and can be easily accessed using a ChargePoint® or ChargeNow card.


Washington, D.C., January 22, 2015 – At the 2015 Washington Auto Show, two of the top automakers, Volkswagen of America and BMW of North America, together with ChargePoint, the largest electric vehicle charging network, announced an initiative to create express charging corridors along heavily-traveled routes on the East and West Coasts. Designed to increase the number of fast charging locations, the initiative will help meet the large and growing demand for convenient, publicly available electric vehicle fast chargers, including direct current (DC) Fast charging locations, and support the adoption of electric vehicles in the United States. In the initial phase, the aim is to install nearly 100 DC Fast charging ports across both coasts, with plans to expand the program to increase access to fast charging across the country. These newly installed DC Fast chargers will be added to the growing ChargePoint network of more than 20,000 charging spots in North America.


With more than 280,000 electric vehicles sold in the United States, EV owners need more charging flexibility while on the go. The express charging corridors will provide electric vehicle drivers access to DC Fast chargers along the most heavily populated and highly-trafficked regions on Interstate 95 on the east coast, from Boston to Washington, D.C., and on the west coast covering and connecting the metropolitan areas of Portland, San Francisco, Los Angeles, and San Diego. The installations will occur both within and between relevant metro areas, strategically-spaced at a maximum of 50 miles apart, making it even easier to take long road trips in an EV.


“A robust network of conveniently located DC Fast charging stations will go a long way toward increasing electric vehicle adoption and making electric vehicle ownership even more enjoyable,” said Robert Healey, Head of EV Infrastructure at BMW of North America. “The express charging corridors are another important step in the development of the U.S. e-mobility infrastructure that makes longer distance travel a real option for consumers, particularly along the most heavily trafficked portions of both coasts—making the BMW i3 and other electric vehicles even more appealing.”


DC Fast Charge


“Volkswagen believes in a holistic approach to e-mobility in order to create a seamless experience for the consumer,” said Jörg Sommer, vice president, product marketing and strategy, Volkswagen of America. “The investment in the express charging corridor will provide e-Golf and other electric vehicle owners with the added support to travel their day-to-day and popular long distance routes.”


Each fast charging location along the express charging corridors is expected to include up to two 50 kW DC Fast chargers, or 24 kW DC Combo Fast chargers with the SAE Combo connector, used in both BMW and Volkswagen electric vehicles as well as many other electric vehicles that incorporate a DC Fast Charging capability. When charging at a 50 kW station, both the BMW i3 and the Volkswagen e-Golf can charge up to 80 percent in 20 minutes. Both vehicles can charge up to 80 percent in 30 minutes at a 24 kW station. Locations will also include Level 2 chargers, currently the most commonly available public charging stations, which are compatible with all electric vehicles. Level 2 stations can dispense up to 25 miles of range per hour of charging, providing a full charge for the BMW i3 and the VW e-Golf within 3.5 to 4 hours.


The DC Fast charging stations will be part of the ChargePoint network and can be easily accessed with a ChargePoint or ChargeNow card or with the ChargePoint mobile app.


“Our goal at ChargePoint is to get everyone behind the wheel of an EV and provide EV charging everywhere they go,” said Pasquale Romano, ChargePoint CEO. “With strategically-placed stations where drivers need them, these express charging corridors will give EV drivers the freedom to go farther and have an EV as their only car without limitation.”


Installations have already begun on the west coast, with the first location in San Diego County. There is a target of nearly 100 DC Fast charging ports in the first phase, available by the end of 2015. DC Fast chargers along the express charging corridors are expected to be installed in convenient locations such restaurants, shopping centers, rest stops, and more. ChargePoint will leverage its existing customer base and knowledge on usage to pick strategic locations either where drivers currently charge, or to fill in spaces where there is currently a lack of infrastructure.


With the investment, Volkswagen, BMW and ChargePoint are providing drivers with the ability and confidence to enjoy longer distance driving and recharge their electric vehicles quickly, ultimately leading to greater electric vehicle adoption.


The post Volkswagen and BMW Join Forces On Express Charging Stations appeared first on VWVortex.






from VWVortex http://ift.tt/1y3BJ9y

via IFTTT

Comments

Popular posts from this blog

Waterfest Moves to Atco Dragway

Waterfest 24 will be held at Atco Dragway, in Atco, New Jersey. The summer event will take place at its new venue on July 21 and 22. Long held in Englishtown, New Jersey, the festival has been such a large part of the VW scene that the latest iteration of the Golf even comes with optional “Englishtown” wheels . The new venue, however, is an NHRA drag track a scant 52 miles southwest of Englishtown. The ¼ mile drag track opened in 1960, which makes it the oldest drag strip in New Jersey. The announcement came today on a social media post that announced the new location. Waterfest is North America’s largest VW/Audi show. As many 20,000 people show up for the annual show, making the second largest show in the world—with Worthersee being number one. 2018 will be Waterfest’s 24 th year in existence. The post Waterfest Moves to Atco Dragway appeared first on VWVortex . from VWVortex http://ift.tt/2GQjkuc via IFTTT

Macau Gets Messy with 16-Car Pileup

The Macau Grand Prix is always good for an accident or two or 16— you may remember Audi’s race ending crash last year —and this year’s event didn’t disappoint. It didn’t take long for things to get messy on the tight road circuit. On the opening lap of the qualifying race a 16-car pileup caused the race to be suspended. Things kicked off when Daniel Juncadella hit a wall on the exit of Police bend, one of the tightest parts of the already tight circuit. The following car of Raffaele Marciello was able to avoid the carnage, but Laurens Vanthoor, who was in the upside-down Audi that ended the race last year, could not avoid Juncadella and together they blocked up the road pretty much completely. “I couldn’t see him [Juncadella] at first. Then I saw the car standing still,” Vanthoor told Motorsport. “I tried to brake but it was just understeering and I couldn’t do anything. There’s room for one car there and you’re blind.” Fourteen more cars would eventually crash into the corner c

The First of its Kind: Integrated Engineering Releases Highly-Anticipated IE450T MK6 Golf R Turbo Kit

After two long years of development, the team at Integrated Engineering has finally announced the release of their IE450T kit for the MK6 Golf R. With their turbo kit bolted on right out of the box, the sport AWD hatch is transformed into a 450bhp monster, with hardly any noticeable increase in spool time. In fact, 435 ft-lbs of torque are achieved at all four wheels, at a mere 3300rpm! By now you are probably asking yourself how this is even possible on a 2.0L engine that made nearly half that power from the factory. By employing true twin-scroll technology into the cast turbo manifold and pairing it with a state-of-the-art BorgWarner EFR turbocharger, IE was able to keep spool time at a minimum and bring the fastest-spooling big turbo setup to the market. “We wanted to offer a kit that would dramatically increase the power output without making the car lose its amazing street-friendly drivability,” mentioned one of the IE engineers. We are told the IE450T leaves the car driving jus